IT
  
Attualmente si sta visualizzando la versione Italy del sito.
Volete passare al vostro sito locale?
<  Ultima edizione

Railnews Magazine April 2026 Edizione posteriore

English
14 Recensioni   •  English   •   Aviation & Transport (Rail)
Only €4,99
Proposals to limit the maximum speed of trains on HS2 to 320km/h to reduce the costs of the project lead the April edition of Railnews. In particular, it is said that 320km/h trains could be tested in advance on other high speed lines, but a 360km/h line would have to be completed before rolling stock testing could start, which would delay the opening still further.

Glasgow Central station had to be closed on 8 March because of a major fire in a neighbouring building, and some platforms remained out of use until 25 March. The station was only slightly damaged, but thousands of trains were cancelled or diverted.

There is still no prospect of passenger trains calling at Winslow in Buckinghamshire in the near future as the dispute over train staffing on East West Rail continues between Chiltern Railways and the RMT. Frustrated local people have now set up an Action Group.

Meanwhile, the renationalisation date of Chiltern Railways has been decided, and the present Arriva contract will end on 20 September, when DfT Operator will take over.

At least Bedlington station on the Northumberland Line was able to open on 29 March, completing the number of places served by the restored line between Newcastle and Ashington.

The last 800m section of the Core Valley Lines in South Wales has been electrified, and work is continuing on the Transpennine Route Upgrade between Leeds and Huddersfield in May and June, with 56 engineering trains being used during May alone.

Diesel trains built for the Midland Main Line in England more than 20 years ago are going to Scotland, where they will replace ScotRail’s High Speed Trains.

Finally, the last few calling points of the Railway200 exhibition train have been announced.

You will find the details in the latest edition of Railnews.

read more read less
Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages

Railnews

April 2026 Proposals to limit the maximum speed of trains on HS2 to 320km/h to reduce the costs of the project lead the April edition of Railnews. In particular, it is said that 320km/h trains could be tested in advance on other high speed lines, but a 360km/h line would have to be completed before rolling stock testing could start, which would delay the opening still further. Glasgow Central station had to be closed on 8 March because of a major fire in a neighbouring building, and some platforms remained out of use until 25 March. The station was only slightly damaged, but thousands of trains were cancelled or diverted. There is still no prospect of passenger trains calling at Winslow in Buckinghamshire in the near future as the dispute over train staffing on East West Rail continues between Chiltern Railways and the RMT. Frustrated local people have now set up an Action Group. Meanwhile, the renationalisation date of Chiltern Railways has been decided, and the present Arriva contract will end on 20 September, when DfT Operator will take over. At least Bedlington station on the Northumberland Line was able to open on 29 March, completing the number of places served by the restored line between Newcastle and Ashington. The last 800m section of the Core Valley Lines in South Wales has been electrified, and work is continuing on the Transpennine Route Upgrade between Leeds and Huddersfield in May and June, with 56 engineering trains being used during May alone. Diesel trains built for the Midland Main Line in England more than 20 years ago are going to Scotland, where they will replace ScotRail’s High Speed Trains. Finally, the last few calling points of the Railway200 exhibition train have been announced. You will find the details in the latest edition of Railnews.


SELEZIONARE IL FORMATO:
Accesso immediato

Offerte digitali disponibili:

Singolo numero arretrato digitale April 2026
 
€4,99 / issue
Questo numero e gli altri numeri arretrati non sono inclusi in un Railnews abbonamento. Gli abbonamenti includono l'ultimo numero regolare e i nuovi numeri usciti durante l'abbonamento e partono da un prezzo minimo di €2,00 per numero . Se volete abbonarvi, date un'occhiata al nostro sito web Opzioni di abbonamento
I risparmi sono calcolati sull'acquisto comparabile di singoli numeri su un periodo di abbonamento annualizzato e possono variare rispetto agli importi pubblicizzati. I calcoli sono solo a scopo illustrativo. Gli abbonamenti digitali includono l'ultimo numero e tutti i numeri regolari pubblicati durante l'abbonamento, se non diversamente indicato. L'abbonamento scelto si rinnoverà automaticamente a meno che non venga annullato nell'area Il mio account fino a 24 ore prima della scadenza dell'abbonamento in corso.

Railnews issue April 2026

Railnews  |  April 2026  


Proposals to limit the maximum speed of trains on HS2 to 320km/h to reduce the costs of the project lead the April edition of Railnews. In particular, it is said that 320km/h trains could be tested in advance on other high speed lines, but a 360km/h line would have to be completed before rolling stock testing could start, which would delay the opening still further.

Glasgow Central station had to be closed on 8 March because of a major fire in a neighbouring building, and some platforms remained out of use until 25 March. The station was only slightly damaged, but thousands of trains were cancelled or diverted.

There is still no prospect of passenger trains calling at Winslow in Buckinghamshire in the near future as the dispute over train staffing on East West Rail continues between Chiltern Railways and the RMT. Frustrated local people have now set up an Action Group.

Meanwhile, the renationalisation date of Chiltern Railways has been decided, and the present Arriva contract will end on 20 September, when DfT Operator will take over.

At least Bedlington station on the Northumberland Line was able to open on 29 March, completing the number of places served by the restored line between Newcastle and Ashington.

The last 800m section of the Core Valley Lines in South Wales has been electrified, and work is continuing on the Transpennine Route Upgrade between Leeds and Huddersfield in May and June, with 56 engineering trains being used during May alone.

Diesel trains built for the Midland Main Line in England more than 20 years ago are going to Scotland, where they will replace ScotRail’s High Speed Trains.

Finally, the last few calling points of the Railway200 exhibition train have been announced.

You will find the details in the latest edition of Railnews.

Per saperne di più leggere di meno
Railnews is the number one publication for the rail industry, focusing on the people and business that keep today’s railway running. Originally produced in 1963 as the house newspaper for British Rail, Railnews continues to inform and impress in the modern industry. As well as in-depth editorial, the newspaper features views and opinions from readers and industry insiders alike.

Come abbonati riceverete i seguenti vantaggi:


•  Uno sconto sul prezzo di vendita della rivista
•  Nuove edizioni consegnate sul tuo dispositivo il giorno stesso dell'uscita
•  Non perderete mai un numero
•  Siete protetti dagli aumenti di prezzo che potrebbero verificarsi nel corso dell'anno

Riceverete 12 edizioni durante un periodo di 1 anno Railnews abbonamento alla rivista.

Nota: le edizioni digitali non includono gli articoli di copertina o i supplementi che si trovano nelle copie stampate.

Il vostro acquisto su Pocketmags.com può essere letto su una delle seguenti piattaforme.


Potete leggere qui sul sito web o scaricare l'applicazione per la vostra piattaforma, ricordandovi di effettuare il login con il vostro nome utente e la vostra password Pocketmags.

Apple Pocketmags Online Pocketmags Google Pocketmags
L'app Pocketmags funziona su tutti i dispositivi iPad e iPhone con iOS 15.6 o versioni successive, Android 8.0 o versioni successive e sui tablet Amazon Fire dal 2018 in poi, anche se i possessori di modelli Fire precedenti possono controllare l'Amazon Appstore direttamente sul proprio dispositivo per confermare la compatibilità. Per gli utenti iOS, consigliamo di utilizzare un dispositivo in grado di eseguire l'ultima versione di iOS per ottenere prestazioni e stabilità ottimali, poiché l'hardware più datato con minore potenza di elaborazione e RAM potrebbe risentire di un caricamento delle pagine più lento o di occasionali problemi di stabilità dovuti ai limiti di memoria del dispositivo. In alternativa, il nostro lettore web funziona con qualsiasi browser moderno compatibile con HTML5, anche se consigliamo Chrome o Firefox per un'esperienza ottimale su PC e Mac.
4,6
/5
Basato su 14 Recensioni dei clienti
5
11
4
2
3
0
2
1
1
0
Visualizza le recensioni

Really interesting

Great for all those trainspotters out there Recensito 25 aprile 2022

Always contemporary

The most up-to-date information on all with regard to the railway network Recensito 09 aprile 2022

Railnews

I had a lot of trouble getting Railnews online so I've had to go back to getting it delivered. now we're in this pandemic, I'm having to go back to reading it online again. Recensito 08 maggio 2020

Articoli in questo numero


Di seguito una selezione di articoli in Railnews April 2026.

August 2026 issue August 2026 August 2026 Acquista per €4,99 Vista | Al carrello
July 2026 issue July 2026 July 2026 Acquista per €4,99 Vista | Al carrello
June 2026 issue June 2026 June 2026 Acquista per €4,99 Vista | Al carrello
May 2026 issue May 2026 May 2026 Acquista per €4,99 Vista | Al carrello
April 2026 issue April 2026 April 2026 Acquista per €4,99 Vista | Al carrello
March 2026 issue March 2026 March 2026 Acquista per €4,99 Vista | Al carrello
February 2026 issue February 2026 February 2026 Acquista per €4,99 Vista | Al carrello
January 2026 issue January 2026 January 2026 Acquista per €4,99 Vista | Al carrello
December 2025 issue December 2025 December 2025 Acquista per €3,49 Vista | Al carrello
November 2025 issue November 2025 November 2025 Acquista per €3,49 Vista | Al carrello
October 2025 issue October 2025 October 2025 Acquista per €3,49 Vista | Al carrello
September 2025 issue September 2025 September 2025 Acquista per €3,49 Vista | Al carrello
August 2025 issue August 2025 August 2025 Acquista per €3,49 Vista | Al carrello
+
Vedi tutti
Chat
X
Supporto Pocketmags