Steam Railway  |  Issue 487
MINEHEAD REVIVAL
The West Somerset Railway will curtail its timetabled operations from January 2 until the end of March – including scrapping its keynote spring gala – following a “routine inspection” by the Office of Rail and Road. The visit was triggered by a whistle-blower who alerted the inspectorate to what they regarded as worrying aspects of how the railway was being run. At the same
time, statements criticising the railway’s operation were made on an internet forum, which were also noted by the regulator.
Seguir leyendo
leer menos
omo abonado recibirá las siguientes ventajas:
• Un descuento sobre el PVP de su revista
• Las nuevas ediciones se envían a tu dispositivo el día de su lanzamiento
• Nunca te perderás un número
• Estás protegido de las subidas de precios que puedan producirse más adelante en el año
Recibirás 13 problemas durante un año Steam Railway suscripción a la revista.
Nota: Las ediciones digitales no incluyen los artículos de portada ni los suplementos que encontraría en los ejemplares impresos.
Artículos de este número
A continuación encontrará una selección de artículos en Steam Railway Issue 487.